Frank checks your renovation documents
so you're not caught out.
Upload your quotes, contract, and drawings. Frank tells you what's missing, what's risky, and exactly what to ask your builder — free.
Used on projects from £20k to £2m+.
Steel beam B3 runs east-west across first floor
Staircase opening positioned where beam runs
Frank identified that a structural steel conflicted with the staircase before installation.
How it works
Upload your documents
Quote, scope of works, contract, drawings — whatever your builder has provided. Up to two documents free.
Frank analyses and flags what matters
Cross-references your documents against UK best practice. Identifies gaps in payment terms, insurance, specifications, programme, snagging provisions, and more. Checks drawings for conflicts between structural and architectural plans.
Download your Schedule of Clarifications
A professional PDF with a covering letter and itemised schedule of questions — ready to send to your builder. Calm, professional, non-confrontational. Normal due diligence, not an accusation.
Activate your project dashboard
Frank generates milestones from your actual scope of works — not a generic template. Each milestone has a checklist of things to verify, questions to ask your builder, and a sign-off process. Track site visits, log variations, and upload valuations.
Frank guides you through to handover
A complete project record — milestones signed off, photos documented, variations logged, valuations checked. At the end, Frank generates a handover package: your evidence file for disputes, house sales, insurance, and future renovations.
What Frank checks
Built for homeowners at every stage
Comparing quotes
Upload multiple quotes. Frank analyses each one individually and produces a side-by-side comparison — what each includes, what each misses, and where they differ on terms.
Contract signed
Upload your contract and scope. Frank checks what protections are in place and what questions to ask before work starts.
Work underway
Track milestones, log site visits, record variations, and check contractor valuations against your project record.
Approaching handover
Frank checks your snagging provisions, retention terms, and handover documentation requirements. Generates a complete project package.
Start with a free analysis
Upload your builder's documents. See what Frank finds. No payment required.
Get started free